Date Available Build to Suit, Available in 180 Days
Structure Pre-engineered steel column and beam structure for heavy use/low maintenance. Bay spacing: 60' x 60'
Walls Split face masonry three sides to 7’-4”, metal to eaves. Metal rear expansion wall.
Floor 6” 4,000 psi concrete heavy duty wire and fiber mesh reinforcing
Clear Ceiling Height 32'
Roof 24-gauge standing seam Galvalume; 30-year service life, low maintenance
Sprinklers Designed to ESFR specifications, 100% wet sprinkler
Power 1200 Amp 277/480 volt 3 phase service minimum, LED Lighting
HVAC Efficient suspended gas forced-air heaters
Docks Six (6) 9’ x 10’ loading doors and one (1) drive thru (12’ x 14’) door. Site allows cross-docking
Parking 33 car spaces (additional possible)
Utilities Water and Sewer: Prince George County Utilities; Electric: Prince George Electrical Coop; Gas: Columbia Gas of VA
Communications T1 available and standard telecommunication services